The next step is the "raising" of the foundation. We raise the low parts of the foundation (in the areas where the pilings are installed) to as near their original elevations as possible.
Jacks are placed on top of the pilings. An experienced AAA Foreman directs the raising while carefully monitoring the reactions of the structure. When the raising is complete, steel shims are inserted between the support blocks and foundation beam to secure the system.
After securing the foundation, the final step is the cleanup. Each hole is refilled with soil, and any concrete breakthroughs are patched. Plants are replanted and the yard, walks and drives are cleaned, raked, swept and washed. The entire process, from start to finish, usually takes 2 or 3 days, depending on the predetermined number of pilings your home requires. |